Safety
GE Finishes First Round of GEnx Checks, Feds Issue AD
Fourteen GEnx-1B engines in the field have undergone ultrasonic inspection, including those powering Japan Airlines’ five 787s. (Photo: Boeing)
Fourteen GEnx-1B engines in the field have undergone ultrasonic inspection, including those powering Japan Airlines’ five 787s. (Photo: Boeing)

GE has finished the first round of checks on all in-service and spare GEnx turbofans ahead of the September 21 publication of a U.S. Federal Aviation Administration airworthiness directive (AD) that calls for ultrasonic inspection of early-build engines’ fan midshafts every 90 days.

Loading…