Aircraft
Boeing Completes First Flight of GE-Powered 787
The first Boeing 787 Dreamliner powered by General Electric GEnx-1B engines–ZA005–completed its first flight at 6:29 p.m.

The first Boeing 787 Dreamliner powered by General Electric GEnx-1B engines–ZA005–completed its first flight at 6:29 p.m. Pacific time yesterday, following a three-hour-and-48-minute maiden mission over the state of Washington.

GE executives and Boeing employees assembled to welcome captains Mike Bryan and Mike Carriker to Boeing Field in Seattle following completion of the flight.